Panasonic VLMV10EX1 Instrukcje Operacyjne Strona 6

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 8
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 5
Main monitor installation
p
osition
About the installation position of the main
monitor and mounting bracket
R Place the main monitor in a location that your
eyes are the same height as the centre of the
display.
R For the following reasons, leave at least 20 cm
(A) of space above, below, and to the left and
right sides of the main monitor:
To prevent malfunction and sound cutting out
To ensure to make sure the reset button (B)
can be used (the reset button is on the
bottom of the main monitor)
1
1
1
1
2
R A
fter deciding where to install the main monitor,
attach the mounting bracket in the location
shown below.
D
E
C
C Main monitor installation position
D 65 mm
E 50.7 mm
Installing the main monitor
1 A
ttach the mounting bracket (A) to the wall
securely.
R Install the mounting bracket on a vertical flat
wall (B).
C
Screws (accessory)
D Hole in wall E 60 mm F 83.5 mm
G 7 mm H 50 mm
2 Connect the wires.
R Connect the wires correctly according to
"Wiring schematic diagram".
R H
ow to make wiring connections
While pressing on the button (A) with a
pointed object such as a screwdriver, insert
the wire into the terminal connector (B).
(To disconnect a wire, while pressing on the
button (A), pull out the wire.)
B
C
D
A
C Bare wire at tip 9 mm
D Wiring from the connected device
(
example: lobby station, distributor,
or other device)
6
Przeglądanie stron 5
1 2 3 4 5 6 7 8

Komentarze do niniejszej Instrukcji

Brak uwag