IMPORTANT:
• Takethefollowingcautionstopreventthisproductfromoverheating.Failuretoobservethis
may cause fire or trouble.
· Do not block the ventilation areas
· Mount the unit at least 2 cm {25/32 inches} away from other walls or objects (Mount the
unit so that excessive force is not applied to the connected cables when they are con-
nected)
· Mount the unit so that nothing is touching the bottom side of the unit
• Take the following cautions when installing the unit in housing (such as camera housing), a
power supply box, or a rack.
· Ensure that the unit is firmly secured
· Ensure that excessive force is not applied to the cables
· Ensure that the unit or cables do not come into contact with any installed heaters or fans
· Do not use in areas that exceed the specified operating temperatures for the unit (
page 28)
Ventilation area
(also on the
other side of
the unit)
2 cm
{25/32 inches}
2 cm
{25/32 inches}
2 cm
{25/32 inches}
Bottom side
Ensure that excessive
force is not applied to
the cables
Ensure that excessive
force is not applied to
the cables